Thank you!
*the commoder walks into the turbolift*
Computer "Freigtherdeck"
Wilton begun to look over some diagnostics of the stations.
- main power relays 5 until 12 on deck 120 need to be refitted.
- Secondary phaser power system need to be check out system by system he said.
He walks to the turbo-lift.
Engineering level he said and the turbo-lift went down.
*walked into OPS*
Hello commander, I wanted to inform you that the Engineering departement will be empty for a while.
I will be joining the freighter to the new base, could you keep an eye on the Engeneering section for me?
Knight walked up to operation and went to this station.
on that moment a alarm on this panel begun to sound.
Strange the main power relays on the engineering section are in state of flux how is that possible.
Yes sir!
Knight walked to Admiral Vorak with a padd with the report on it.
Admiral Vorak i have send 2 teams out to repair the damaged systems.
I was thinking of refitting shuttlebay 4 so it could carry more shuttles what do you think?
"Permission granted to refit shuttlebay 4. My apologies for the delay, Mr. Knight, I had alot of paperwork to attend to after my return from Corporation space and negotiations with them in our Embassy."