Expansion Fleet - Avalon Archive

AVALON STATION => Station Ops => Topic started by: Detrell on October 05, 2002, 11:32:20 PM

Title: OPS work
Post by: Detrell on October 05, 2002, 11:32:20 PM
Thank you!

*the commoder walks into the turbolift*
Computer "Freigtherdeck"

Title: OPS work
Post by: Knight on October 01, 2002, 07:12:11 PM
Wilton begun to look over some diagnostics of the stations.

- main power relays 5 until 12 on deck 120 need to be refitted.
- Secondary phaser power system need to be check out system by system he said.

Title: OPS work
Post by: Knight on October 06, 2002, 10:59:04 AM
He walks to the turbo-lift.
Engineering level he said and the turbo-lift went down.
Title: OPS work
Post by: Detrell on October 01, 2002, 07:21:26 PM
*walked into OPS*
Hello commander, I wanted to inform you that the Engineering departement will be empty for a while.
I will be joining the freighter to the new base, could you keep an eye on the Engeneering section for me?
Title: OPS work
Post by: Knight on October 22, 2002, 12:32:02 PM
Knight walked up to operation and went to this station.
on that moment a alarm on this panel begun to sound.

Strange the main power relays on the engineering section are in state of flux how is that possible.

Title: OPS work
Post by: Knight on October 05, 2002, 09:46:37 PM
Yes sir!
Knight walked to Admiral Vorak with a padd with the report on it.
Admiral Vorak i have send 2 teams out to repair the damaged systems.

I was thinking of refitting shuttlebay 4 so it could carry more shuttles what do you think?

Title: OPS work
Post by: Vorak on October 22, 2002, 02:10:05 PM
"Permission granted to refit shuttlebay 4. My apologies for the delay, Mr. Knight, I had alot of paperwork to attend to after my return from Corporation space and negotiations with them in our Embassy."