This is an archive board, where you can read missions and discussions of the old storylines, revolving around Avalon Station (2001 - 2008). Do not use this board to post new topics.
This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.
Show posts MenuOFF: With your orders and promission I will return to engineering.
Moments later, she instructs the engineering team to the appropriate locations to begin in the system take-over and to find out how to run these systems and to reprogram in command codes.
On her communicator she sends a transmittion to inform the Captain of her team's progress.
"Sir. Engineering away team is in the process of the take-over of systems controlls. Sir"
"Cymidei walks to a position within the room that is, in respect, out of the way and still in view and hearing for the away teams progress."
"The Dianostics of the systems is almost complete. At this moment there are only a few things that require repairs. Most of which was due to phasers when we were taking over the ship. Thankfully all of the main consuel were messed during the mission; so the repairs should not be too much trouble and I have already sent my team on the way to repair these small damages. Besides from that, the ship is in working order."
She writes up a document in the computers files of plans to use to power source found.
While waiting for the Captain to respond, she puts a containment field around the device and continues to search the for other devices that are questionable to their role on this ship.